MRP, JIT, and OPT: A Comparison on the Production Floor

Abstract

In order to compete in manufacturing, industry realizes it must work more efficiently with its resources. Three manufacturing techniques have been developed to assist industry in this challenge --MRP, JIT, and OPT. This paper compares these three techniques. It concentrates on the factors that affect production after vendor materials are in-house. A brief discussion of some of the implementation difficulties a company may face during the transition to a new philosophy is also addressed. Finally, a case study of a low volume, highly technical military project is evaluated and analyzed

    Similar works