An integrated vehicle and crew scheduling is a
complex problem to solve because of the large number
of resources that need to be managed, and complexity
of rules regarding allocating vehicle and crew shifts.
However, there are potential benefits from integrating
both scheduling including cost saving in regional area
where routes have fewer relief points. The aim of this
research is to design the integrated vehicle and crew
scheduling system using Multi-Agents System (MAS).
The paper presents agents analysis and design using
Gaia methodology