Very poor ground conditions and soils that were susceptible to liquefaction to depths of up to 20m beneath the site were major problems for the construction of the largest natural gas processing terminal in Europe. An innovative foundation solution combining deep vibro compaction with short cast in place piles driven into the treated soils was adopted as both cost and programme effective. The Design and Build project also included advance civils work comprising earthworks, drainage and road construction. The contract started in September 1991 and was completed by October 1992, with the process plant programmed to be on-stream by October 1994. This paper describes the seismic aspects of the foundation solution