Design and Construction of a Soil Bentonite Slurry Wall Around an Operating Facility Superfund Site

Abstract

A soil bentonite slurry wall was designed for an NPL site to stop further migration of chemicals in a complex aquifer system, and to facilitate the removal of possible chemical sources from saturated zones beneath the site. Pumping from within the slurry wall will maintain inward and upward hydraulic gradients and thus stop further lateral or vertical migration of chemicals from the contained area. The slurry wall was constructed under an exceptionally detailed Quality Assurance; Quality Control review by the Contractor and two independent consulting firms. Ground movements, vibration levels and opacity of dust produced during construction were monitored for compliance with design specifications. It was made a condition of the contract that no hazardous material could leave the site. Federal regulations required all persons involved in site work to have health and safety training. Careful planning and close liaison between the Owner, Engineer and Contractor has enabled the slurry wall to be constructed in a business park environment around an operating manufacturing facility without disruption to production

    Similar works