Distress — Cause and Effect: A Diagnostic Study

Abstract

Detailed site investigation, rigorous analysis and smart design of any engineering project prove to offer a successful product provided Quality Control and Quality Assurance are enforced during the construction phase. Failure to comply with QA/QC led to premature distress and extensive damage. A typical case, where negligence to address extenuating problems that arose during the construction stage resulted in severe damage is investigated and reported. Post-construction diagnostic study to unravel the cause and effect is presented

    Similar works