Use of Surcharges as Treatment of Residual Soil Foundation - A Case History

Abstract

Predetermined locations for storage of leaching materials needed total warranty against cracking as result of differential settlements. Two stockpiles had to be located on a platform, one placed in area of low height cuts of unsaturated residual soils, the other over fills placed without compaction criteria over saturated clayey soils of low consistency. It was decided to preload the platform in order to minimize future absolute and differential settlements, reducing them to allowable limits. The systematic interpretation of the instrumentation allowed the optimization of the treatment. The behaviour during unloading of the soils indicated heaves much smaller than the limits preestablished

    Similar works