research

MicroTCA implementation of synchronous Ethernet-Based DAQ systems for large scale experiments

Abstract

Large LAr TPCs are among the most powerful detectors to address open problems in particle and astro-particle physics, such as CP violation in leptonic sector, neutrino properties and their astrophysical implications, proton decay search etc. The scale of such detector implies severe constraints on their readout and DAQ system. In this article we describe a data acquisition scheme for this new generation of large detectors. The main challenge is to propose a scalable and easy to use solution able to manage a large number of channels at the lowest cost. It is interesting to note that these constraints are very similar to those existing in Network Telecommunication Industry. We propose to study how emerging technologies like ATCA and μ\muTCA could be used in neutrino experiments. We describe the design of an Advanced Mezzanine Board (AMC) including 32 ADC channels. This board receives 32 analogical channels at the front panel and sends the formatted data through the μ\muTCA backplane using a Gigabit Ethernet link. The gigabit switch of the MCH is used to centralize and to send the data to the event building computer. The core of this card is a FPGA (ARIA-GX from ALTERA) including the whole system except the memories. A hardware accelerator has been implemented using a NIOS II μ\muP and a Gigabit MAC IP. Obviously, in order to be able to reconstruct the tracks from the events a time synchronisation system is mandatory. We decided to implement the IEEE1588 standard also called Precision Timing Protocol, another emerging and promising technology in Telecommunication Industry. In this article we describe a Gigabit PTP implementation using the recovered clock of the gigabit link. By doing so the drift is directly cancelled and the PTP will be used only to evaluate and to correct the offset.Comment: Talk presented at the 2009 Real Time Conference, Beijing, May '09, submitted to the proceeding

    Similar works

    Full text

    thumbnail-image

    Available Versions

    Last time updated on 05/06/2019