Valoración de flujos de caja en inflación. El caso de la regulación en el Banco Mundial

Abstract

We show that project evaluation should be based on free cash flows at nominal prices. We present a case where the results from the constant price method are biased upwards and there is a risk to accept bad projects. It is a widespread practice to evaluate projects at constant prices. With an example presented in the training on economic regulation of public utilities developed by the World Bank Institute we asses that methodology. We show an overvaluation of 21% when compared with the current prices methodology and using a correct Weighted Average Cost of Capital, WACC

    Similar works