WPI Sports & Recreation Center: Construction Management through 5D Building Information Modeling with Alternative Design Considerations

Abstract

This project utilized Building Information Modeling to produce a 5-dimensional model of the WPI Sports and Recreation Center. The model was used to perform a construction schedule performance analysis of major work packages. In addition, alternative analysis and design was performed on the structural, geotechnical and functional aspects of the connection between Harrington Auditorium and the Recreation Center

    Similar works

    Available Versions