This document contains the fully detailed engineering reports associated with the 2017 Civil Engineering senior capstone project. The scope of this theoretical project included widening a stretch of the Broadway Boulevard roadway from Highland Avenue to Warren Avenue in Tucson, AZ. The roadway was widened from four to six lanes with medians, bus pullouts, and curb improvements. This report first presents the Statement of Qualifications (SOQ) and Design Summary Report (DSR) created during the Fall semester. Then, the technical reports and aspects created in the Spring semester are presented in the following order: traffic engineering report, pavement design report, drainage report, structural report, landscaping report, and finally the detailed design plans with the engineer’s cost estimate