The Extreme Light Infrastructure - Nuclear Physics
Gamma Beam System (ELI-NP GBS) will be installed and
commissioned starting within the next year in Magurele,
Romania. It will generate gamma beam through Compton
back-scattering of a recirculated laser and a multi-bunch
electron beam, produced by a 720 MeV LINAC. In order
to obtain bunch by bunch position measurements, four cavity
beam position monitors (cBPM) near the two interaction
points are foreseen. Extensive tests on the cBPM readout
electronics, recently developed by Instrumentation
Technologies and acquired for ELI-NP GBS, were performed
in laboratory at INFN-LNF and at FLASH in
DESY, during the user operation. In the latter case, three
cBPMs installed along the LINAC, with similar features as
the ones of ELI-NP GBS, were used as measuring devices
and signal sources for the read-out electronics under test.
We present here the measurements collected and the related
analysis, with a particular focus on the beam position
measurement resolution