Optimization of Battery Energy Storage to Improve Power System Oscillation Damping

Abstract

A placement problem for multiple Battery Energy Storage System (BESS) units is formulated towards power system transient voltage stability enhancement in this paper. The problem is solved by the Cross-Entropy (CE) optimization method. A simulation-based approach is adopted to incorporate higher-order dynamics and nonlinearities of generators and loads. The objective is to maximize the voltage stability index, which is setup based on certain grid-codes. Formulations of the optimization problem are then discussed. Finally, the proposed approach is implemented in MATLAB/DIgSILENT and tested on the New England 39-Bus system. Results indicate that installing BESS units at the optimized location can alleviate transient voltage instability issue compared with the original system with no BESS. The CE placement algorithm is also compared with the classic PSO (Particle Swarm Optimization) method, and its superiority is demonstrated in terms of a faster convergence rate with matched solution qualities.Comment: This paper has been accepted by IEEE Transactions on Sustainable Energy and now still in online-publication phase, IEEE Transactions on Sustainable Energy. 201

    Similar works

    Full text

    thumbnail-image

    Available Versions

    Last time updated on 10/08/2021