The thesis presents the construction process on a case of road crossover over the railway,\ud
where special attention is placed to specific requirements that appear when different\ud
infrastructure systems intersect, and to the analysis of deficiencies that were identified during\ud
final check of the structure.\ud
The first part describes the general features of the the construction process. Construction\ud
phases, roles and responsibilities of various participants, and extensive documentation\ud
required for the project execution from the initial feasibility study to the final delivery to the\ud
client are presented. The key legal documents that regulate all construction phases (from the\ud
conceptual phase to commissioning) are discussed. The second part of the thesis presents the\ud
case study, the application of guidelines specified in the first part of the thesis that relate to\ud
the specific requirements (intersection of two different infrastructure systems), construction\ud
details and the comparison of the planned and as-built schedule. The last part of the thesis\ud
presents the results of the analysis of the deficiencies that were identified during the final\ud
check. The analysis shows that the main factor causing the deficiencies is lack of\ud
communication between participants during the construction of the road crossover over the\ud
railway