research

PERANCANGAN SISTEM PENGENDALIAN PERSEDIAAN BBM PADA SPBU DENGAN KONSEP MIN-MAX STOCK LEVEL DAN TIME PHASED ORDER POINT (STUDI KASUS SPBU 44.501.01)

Abstract

The concept of supply chain inventory requirement has been widely used by companies to improve meeting the needs of its customers. The lost of selling coused from inventory shortage is an important thing to be avoided by the company. This research aims to build a inventory control system supplies fuel to the method of Distribution Requirements Planning (DRP) web-based on gas stations in the area of Semarang. The method used for planning is the ordering of distribution requirements planning with the stage of determining the net requirements (netting), selection Lot (lotting), the timing of orders (offsetting) and the determination of gross requirements for next level (exploision). The Time Phased Order Point and min-max stock level Consept used for optimalitation needs Planning. Model Design of the system is using waterfall model which consists of system analysis, system design, system implementation and testing programs. The research result of inventory control system can be used to support and improve inventory control at retail outlets. The results of testing the system states that the system developed to support inventory control, to increase the need security at gas stations supply needs to be better and minimize losses orders. Keywords: Inventory Control, Needs Planning, Time Phased Order Point, Distribution Requirement Planning, Design system, Waterfall mode

    Similar works