NASA Goddard Space Flight Center requires that each project demonstrate a minimum of 5 C margin between temperature predictions and hot and cold flight operational limits. The bounding temperature predictions include worst-case environment and thermal optical properties. The purpose of this work is to: assess how current missions are performing against their pre-launch bounding temperature predictions and suggest any possible changes to the thermal analysis margin rule