Test data of the RFS Program in the Production phase and computer automation are presented, as an essential element in the evaluation of the RFS performance in a simulated spacecraft environment. Typical production test data will be discussed for stabilities from 1 to 100,000 seconds averaging time and simulated time error accumulation test. Also, design considerations in developing the RFS test systems for the acceptance test in production are discussed