research

Characterizing the GOES-R (GOES-16) Geostationary Lightning Mapper (GLM) On-Orbit Performance

Abstract

Two overlapping efforts help to characterize the GLM performance, the Post Launch Test (PLT) phase to validate the predicted pre-launch instrument performance and the Post Launch Product Test (PLPT) phase to validate the lightning detection product used in forecast and warning decision-making. This paper documents the calibration and validation plans and activities for the first 6 months of GLM on-orbit testing and validation commencing with first light on 4 January 2017. The PLT phase addresses image quality, on-orbit calibration, RTEP threshold tuning, image navigation, noise filtering, and solar intrusion assessment, resulting in a GLM calibration parameter file. The PLPT includes four main activities, the Reference Data Comparisons (RDC), Algorithm Testing (AT), Instrument Navigation and Registration Testing (INRT), and Long Term Baseline Testing (LTBT). Field campaigns are also designed to contribute valuable insights into the GLM performance capabilities. The PLPT tests each contribute to the beta, provisional, and fully validated GLM data

    Similar works