research

Aplikasi Pengukuran Risiko Transformasi Organisasi (Studi Kasus Pada Perusahaan Telekomunikasi)

Abstract

. The aim of this study is to perform quantitative risk assessment oforganizational transformation at PT X and develop its risk mitigation. The design ofthis study based on business risk analysis model by Fekete (2000), which are consist 4steps: (1) risk identification; (2) qualitative analysis; (3) quantitative analysis; and (4)risk response. The result of study showed there are significance risks of organizationaltransformation at PT X with the biggest risk level in consecutive order are systemreadiness factor, organization factor, and culture factor

    Similar works