research

Analisa Pengaruh Pengendalian Kinerja Proyek Terhadap Mutu Proyek Konstruksi Dengan Menggunakan Uji Statistika

Abstract

In the construction project planning and controlling is the most basic function in realizing the success of an activity in construction project. A success a project cannot be separated by a series of activities which is included the stages of planning, implementation and controlling. Controlling, monitoring and performance measurement needs to be done as to determine whether there are deviation in the work implementation of what has been set. Then, in this case needs to be analyzed to know the effect of controlling project performance indicators (Occupational Safety and Health, Cost and Time) toward the quality of construction project.The result of the research shows there is simultaneously a positive and significant influence between the variables of Occupational Safety and Health (X1), a Cost variable (X2) and a Time variable (X3) simultaneously toward Quality (Y1) is showed the value Fcount (25.755) is larger than Ftable (2.71) with significance level of 0.000 is smaller than sig. (α) of 0.05.For the partial variable of Occupational Safety and Health (X1) indicates tcount amounted to 3.672 with significance level amount of 0.000 is larger than ttable 1.98667 and a percentage of (37%), a cost variable (X2) indicates tcount amounted to 1.705 with significance level amount of 0.092 is smaller than ttable 1.98667 and a percentage of (17%), and a time variable (X3) is showed value of tcount amounted to 1.705 with significance level amount of 0.334 is smaller than ttable 1.98667 and a percentage amount of (17%)

    Similar works

    Full text

    thumbnail-image