State of the NASA Aeropropulsion Discipline Input from the Glenn Research Center

Abstract

PROBLEM: Current power turbines are designed for single operating speed, and performance degrades rapidly as power turbine speed decreases. OBJECTIVES: Demonstrate 50 improvement in efficient operational capability using a Variable Speed Power Turbine concept. (Refer to figure lower left, where the goal is to raise efficiency from the current technology line to the green line which represents the AVSPOT VSPT goal.APPROACH: Conduct RD required to advance the technology readiness level of VSPT technology to TRL 4Partner with DoD and leverage DOD AVSPOT contract to share government cost (5050) of contracted efforts to GE and PW for VSPT TRL 45 demonstration