research

Travel Time Variability After A Shock: The Case Of The Twin Cities Ramp Meter Shut Off

Abstract

Ramp meters in the Twin Cities were turned off for 8 weeks in the Fall of 2000. This paper analyzes travel time variability with and without ramp metering for several representative freeways during the afternoon peak period. Travel time variability is generally reduced with metering. However, it is found that ramp meters are particularly helpful for long trips relative to short trips. The benefits from reducing travel time variability with meters are on the order of 37% of the benefits from reducing average travel time.Freeway Operations, Ramp Meters, Travel Time Variability Before-and-after study; Ramp Metering System; Variable Message Signs (VMS); Freeway Service Patrol; Highway Helper Program.

    Similar works