The problem of planning the thermal power station equipment repair in conditions of transition to adjustable markets of energy has been analyzed. The bases of applying the system approach in conditions of real restrictions by financial resources are stated. The method based on classification of sources of repair work initiation and considering priorities of works for different control levels is offered as a scheduling algorithm