TUPPO008International audienceAccelerator Driven system (ADS) are being considered for their potential use in the transmutation of nuclear waste. Such a device typically requires a 600MeV to 1GeV accelerator delivering a high intensity beam. Because of the induced thermal stress to the subcritical core, the high-power proton LINAC will have to fulfill stringent reliability requirements. One working package of the EUROTRANS project is dedicated to the design, realization and tests of a prototypical cryomodule, operating at 2K, for the LINAC high energy section. Elliptical cavities will compose this accelerator section. A full scale cryomodule with a beta 0.47 TRASCO cavity and its cold tunning system will be tested at IPNO, early 2010. Experiment aims to evaluate the cavity performances (Eacc=8.5 MV/m) but above all the whole cryomodule reliability to fulfill ADS stringent requirements