research

Beam waist manipulations at the ATF2 interaction point

Abstract

TH6PFP024International audienceThe ATF2 project is the final focus system prototype for ILC and CLIC linear collider projects, with a purpose to reach a 37nm vertical beam size at the interaction point. We report on techniques developed based on simulation studies to adjust the horizontal and vertical beam waists independently in the presence of errors, at two different IP locations where the beam size can be measured with different accuracies. During initial commissioning, we will start with larger than nominal β -functions at the IP, to reduce the effects from higher-order optical aberrations and thereby simplify the optical corrections needed. The first measurements in such intermediate β -configurations are reported

    Similar works

    Full text

    thumbnail-image

    Available Versions