Abstract

On March 23, 2009, the first beam was successfullytransported to the final focal plane of the SHARAQspectrometer. We investigated detector responses toheavy-ion beams and the ion optical properties ofthe SHARAQ spectrometer1) and the high-resolutionbeam line2) in the subsequent commissioning runs andfound that the system as a whole worked almost as perits design. The first physics run with the spectrometerwas performed in November 2009. In this article, wereview the progress in the SHARAQ project in 2009