We present a conceptual layout of a beta-beam facility located at DESY. It makes maximal use of the existing HERA facility. For the investigation of CP violation in the neutrino sector a high intensity beam of muon neutrinos will be needed along with a beta-beam facility. The physics program requires these to be build at different sites. A location of the muon-neutrino beam at a future CERN SPL and the beta-beam facility at HERA gives an excellent solution