research

Operational considerations for the PSB H- Injection System

Abstract

For the LINAC4 project the PS Booster (PSB) injection system will be upgraded. The 160 MeV Hbeam will be distributed to the 4 superimposed PSB synchrotron rings and horizontally injected by means of an H- charge-exchange system. Operational considerations for the injection system are presented, including expected beam losses from unwanted field stripping of H- and excited H0 and foil scattering, possible injection failure cases and expected stripping foil lifetimes. Loading assumptions for the internal beam dumps are discussed together with estimates of doses on various components

    Similar works