Abstract

One of the crucial aspects of the commissioning of the CMS silicon tracker will be the absolute timing adjustment of each module, to accommodate both delays introduced by the hardware configuration and effects due to the time of flight of particles. The objective is to be optimally synchronized with the bunch-crossing to maximize the efficiency while minimizing the number of remnant hits from the adjacent bunch-crossings. In the present note, a procedure to reach that goal is studied. Monte Carlo studies as well as the analysis of data from the commissioning of the detector are used to assess the time needed and the resolution that can be achieved. Critical aspects are discussed, and results from the first implementation are presented