research

ATLAS Pixel Detector System Test

Abstract

On June 25th of 2007 the ATLAS collaboration lowered the pixel detector into place, however before this the detector had to be qualified through a series of tests. Prior to assembly, each individual piece of the detector and services chain passed a set of quality controls. This was followed by the construction and test of the whole pixel detector. This test of the full chain of services -including the voltage supplies, opto-boards, cooling, temperature monitoring, control software, and the pixel modules themselves- is referred to as the Pixel System Test. The System Test took place in an above-ground laboratory setting at CERN and consisted of two main parts. The first half of the test focused on one of the pixel detector’s endcaps. This endcap consists of 144 modules, making up roughly 10% of the total pixel detector. For the pixel endcap test, most of the 144 modules were operated simultaneously which required that the pixel endcap’s cooling system be functioning as well[1]. Additionally, four scintillators were added above and below the detector which trigged on cosmic muons. As a result, the pixel detector measured its first cosmic tracks during this test. After the cosmic test the pixel collaboration connected the entire pixel detector a few modules at a time. The cooling for the pixel detector could not be used in this setting, and to prevent overheating any componants only one chip was powered on at a time. This half of the system test is referred to as the connectivity test[3]

    Similar works