During the machine development session of 2007-10-03, the energy matching between PS and SPS was completed for the 208Pb82+ beam. The I-LHC RF low level, including the phase loop and the synchronisation loop, was commissioned to capture a single bunch of 208Pb82+. After commissioning, the beam was used for several non RF related machine developments