research

Operation of the GTS-LHC Source for the Hadron Injector at CERN

Abstract

The GTS-LHC ion source, designed and build by CEA Grenoble, was installed and commissioned at CERN in 2005. Since than the source has delivered oxygen and lead ion beams (O4+ and Pb27+ from the source, Pb54+ from the linac) for the commissioning of the Low Energy Ion Ring (LEIR). Results of this operation and attempts to improve the source performance and reliability, and the linac performance will be presented in this paper

    Similar works