research

Integer programming for building robust surgery schedules.

Abstract

This paper proposes and evaluates a number of models for building robust cyclic surgery schedules. The developed models involve two types of constraints. Demand constraints ensure that each surgeon (or surgical group) obtains a specific number of operating room (OR) blocks. Capacity con- straints limit the available OR blocks on each day. Furthermore, the number of operated patients per block and the length of stay (LOS) of each operated patient are dependent on the type of surgery. Both are considered stochas- tic, following a multinomial distribution. We develop a number of MIP-based heuristics and a metaheuristic to minimize the expected total bed shortage and present computational results.Constraint; Demand; Distribution; Expected; Heuristic; Integer programming; Model; Models; Resource leveling; Surgery scheduling;

    Similar works