research
Noise measurements taken at LAX during operational evaluation of two-segment approaches in a 727-200 aircraft
- Publication date
- Publisher
Abstract
A series of seven noise measurements were made each day over a period of fifteen days. The first and last flights each day were made by a specially instrumented 727-200 aircraft being used to evaluate the operational effectiveness of two-segment noise abatement approaches in scheduled service. Noise measurements were made to determine the noise reduction benefits of the two-segment approaches