thesis

Man power/cost estimation model: Automated planetary projects

Abstract

A manpower/cost estimation model is developed which is based on a detailed level of financial analysis of over 30 million raw data points which are then compacted by more than three orders of magnitude to the level at which the model is applicable. The major parameter of expenditure is manpower (specifically direct labor hours) for all spacecraft subsystem and technical support categories. The resultant model is able to provide a mean absolute error of less than fifteen percent for the eight programs comprising the model data base. The model includes cost saving inheritance factors, broken down in four levels, for estimating follow-on type programs where hardware and design inheritance are evident or expected

    Similar works