research

BRAVO economic study of LANDSAT follow-on

Abstract

The LANDSAT Follow-On satellite consists of two major systems: the instrument module and the Multi-Mission Modular Spacecraft (MMS). The instrument module contains the thematic mapper and the five-band multispectral scanner instruments. The instrument module also includes the solar array, the tracking and data relay satellite (TDRS) antenna, and the wideband data module. The MMS contains the modularized and standardized power, propulsion, attitude control, and command and data handling subsystems. The Shuttle will be supporting the LANDSAT Follow-On system. The LANDSAT Follow-On Project plans two Delta 3910 launches. The first is scheduled for 1981; the second Delta launch will occur as needed to keep one satellite operational on orbit. The second satellite will be ready six months after the first. It could be launched any time after that. Shuttle support of the system could begin in early 1983 but would be scheduled to start after the second Delta launch

    Similar works