Pretest information for a test to validate plume simulation procedures (FA-17)

Abstract

The results of an effort to plan a final verification wind tunnel test to validate the recommended correlation parameters and application techniques were presented. The test planning effort was complete except for test site finalization and the associated coordination. Two suitable test sites were identified. Desired test conditions were shown. Subsequent sections of this report present the selected model and test site, instrumentation of this model, planned test operations, and some concluding remarks