slides

Installation and checkout of the DOE/NASA Mod-1 2000-kW wind turbine generator

Abstract

The Mod-1 machine was assembled without the blades, tested, and sent to the site at Boone, North Carolina for erection. The blades were transported directly to the site. A series of checkout tests were then conducted to evaluate performance and loads. The results of these tests compared well with the design data