research

Measurements for liquid rocket engine performance code verification

Abstract

The goal of the rocket engine performance code verification tests is to obtain the I sub sp with an accuracy of 0.25% or less. This needs to be done during the sequence of four related tests (two reactive and two hot gas simulation) to best utilize the loss separation technique recommended in this study. In addition to I sub sp, the measurements of the input and output parameters for the codes are needed. This study has shown two things in regard to obtaining the I sub sp uncertainty within the 0.25% target. First, this target is generally not being realized at the present time, and second, the instrumentation and testing technology does exist to obtain this 0.25% uncertainty goal. However, to achieve this goal will require carefully planned, designed, and conducted testing. In addition, the test-stand (or system) dynamics must be evaluated in the pre-test and post-test phases of the design of the experiment and data analysis, respectively always keeping in mind that a .25% overall uncertainty in I sub sp is targeted. A table gives the maximum allowable uncertainty required for obtaining I sub sp with 0.25% uncertainty, the currently-quoted instrument specification, and present test uncertainty for the parameters. In general, it appears that measurement of the mass flow parameter within the required uncertainty may be the most difficult

    Similar works