research

Entry Systems Panel

Abstract

As general findings, lessons learned from shuttle are: (1) bridge established between development center (JSC) Research Centers (ARC, LARC), and industry (RI, LMSC, Corning, Mansville, 3M LTV, Union Carbide, Hexcel) for shuttle TPS; (2) not all test results adequately analyzed or in hindsight, completely encompassing all failure modes; (3) gap heating effects from ground facilities not totally indicative of flight experience; (4) need to design with operations in mind (not just to cost) example: moisture intrusion of GR/EP, many other examples; (5) RSI- developed as point design for maneuvering entry vehicle of high L/D; and (6) RSI - 15 years from invention to use on flight hardware

    Similar works