research

Results of the RAMI analyses performed for the IFMIF accelerator facility in the engineering design phase

Abstract

This paper presents a summary of the RAMI (Reliability Availability Maintainability Inspectability) analyses done for the IFMIF (International Fusion Materials Irradiation Facility) Accelerator facility in the Engineering Design Phase. The methodology followed, the analyses performed, the results obtained and the conclusions drawn are described. Moreover, the consequences of the incorporation of the RAMI studies in the IFMIF design are presented and the main outcomes of these analyses are shown. (C) 2015 Elsevier B.V. All rights reserved.Postprint (author's final draft

    Similar works