Based on a superconducting magnetic energy storage (SMES) a long-pulse klystron modulator has been designed for use in the TESLA test facility (TTF) at DESY, Hamburg. A proto-type with an output power of 25 MW is under development at Forschungszentrum Karlsruhe in cooperation with the office of engineering lbK at Karlsruhe. Including a pulse transformer (1:13/11.5), the system will deliver pulses of 130 kV or 115 kV, 1.7 ms pulse length with a flat top of #+-# 0.5%, at a repetition rate up to 10 Hz. This new system's main features are a highly dynamic SMES (> 100 T/s), a high current power supply (rated 27 V/2.6 kA), a switched-mode high voltage power supply (rated 14 kV/45 A), a fast thyristor power switch for 2.6 kA approx. continuous current/ 2 ms break, an IGCT power switch rated 2.6 kA/14 kV, a protection switch unit and a system control unit. This demonstration system is to serve alternatively two klystrons of 5 MW RF output or one multibeam klystron of 10 MW RF output. A significant part of the components of the system has been built. A first set of the system components had been arranged to form a model of the modulator and 1 MW pulses were generated. The next large step in the area of the power electronic part is to increase the power of this test arrangement up to 10 MW. The SMES and its cryostat have undergone initial testing. The data acquisition and control system under development at DESY has been taken over and adjusted to our computer and experimental environment. (orig.)Available from TIB Hannover: ZA 5141(6568) / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technische InformationsbibliothekSIGLEDEGerman