Monte Carlo production in CMS has received a major boost in performance and
scale since the past CHEP06 conference. The production system has been re-engineered in order
to incorporate the experience gained in running the previous system and to integrate production
with the new CMS event data model, data management system and data processing framework.
The system is interfaced to the two major computing Grids used by CMS, the LHC Computing
Grid (LCG) and the Open Science Grid (OSG).
Operational experience and integration aspects of the new CMS Monte Carlo production
system is presented together with an analysis of production statistics. The new system
automatically handles job submission, resource monitoring, job queuing, job distribution
according to the available resources, data merging, registration of data into the data
bookkeeping, data location, data transfer and placement systems. Compared to the previous
production system automation, reliability and performance have been considerably improved. A
more efficient use of computing resources and a better handling of the inherent Grid unreliability
have resulted in an increase of production scale by about an order of magnitude, capable of
running in parallel at the order of ten thousand jobs and yielding more than two million events
per day