Abstract

The two large reprocessing plants in Europe, located in Sellafield (UK) and La Hague (F) have a throughput of 800 t and 1600 t of spent fuel per year. In order to meet the safeguards criteria of quantity, timeliness and probability (QTP), these facilities deserve particular attention and appropriate safeguards measures have to be implemented. At either plant Euratom installed an on-site laboratory where the verification measurements are performed with minimal time delays and at highest possible accuracy.JRC.E-Institute for Transuranium Elements (Karlsruhe

    Similar works

    Full text

    thumbnail-image