thesis

Vehicle and crew scheduling : the general problem and a case study of the MBTA

Abstract

Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1995.Includes bibliographical references (p. 163-172).by Wen-Cheng Chang.M.S

    Similar works