Due to the rapidly increasing diversity of products and smaller batch sizes, the setup time reduction is of crucial importance for the profitability of a company. The article deals with the problem of long setup times in a wood company and possibilities for the solution with the SMED method. On a practical case, the setup time reduction on four-side planing machine was analysed