research

PERENCANAAN KAPASITAS WAKTU PRODUKSI SANDAL DENGAN METODE CAPACITY REQUIREMENT PLANNING (CRP) DI CV. DONI BUMI PERKASA SURABAYA

Abstract

In the production process a company is demanded to supply the product on time, anywhere, and amount order. If the Planning-needs of process time capacity is not optimum, then it will disturb the production-scheduled and caused loss profit for the time and process session. So, it will be needed a planning method to the time capacity for a good production that suitable for the maximum output to fulfill market-demand. CV. DONI BUMI PEKASA is a company producing various kinds of sandals made from eva sponge. A problem that faced to the company is the lateness of the production process to the sandals product, until it disturbs the scheduled of making the product and it caused loss-profit, by affecting the time and process side. This thing really affects the way of CV. DONI BUMI PERKASA to improve its production, and the filling of the consumer needs is disturbed. The way this problem exists makes this research uses Capacity Requirement Planning (CRP), with a hope CV. DONI BUMI PERKASA can handle the planning and the process to suit the level of the request is suitable with the time capacity that available by identifying the center of the working area which is over and below capacity that available, so it makes the processing of the product can be faster. For the counting of the lacking to the time capacity on March 2012February 2013, it an be known that by using company method valuing to the sum of lacking to the time capacity up to 721,9 hours, and by using CRP method valuing to the sum of lacking to the time capacity up to 191,1 hour, so the CRP method is better than company’s method, Because of lacking to the time capacity that produces a little than company’s method. In filling the request in March 2013 – February 2014 by using work-hours 8 hour/shift, proved the company still in the loss-profit stages in the time capacity up to 104,64 hour, to fix this up, so it will be given the idea to an addition of work-hour it makes the lacking of time capacity solved. Key words : Planning of the capacity need, Capacity Requirement Planning (CRP

    Similar works