Trenchless tunneling methods were key to the INDOT SR 37 project’s success by providing drainage for new depressed interchanges. Gravity outfall sewers were selected over pump stations, which eliminated long-term O&M costs. This presentation explains how trenchless methods were successful in difficult ground and groundwater conditions. Approximately 1.4 miles of 54-inch-diameter storm sewers were successfully installed using trenchless tunneling methods, including a record breaking 2,304-foot-long curved micro tunnel boring machine (MTBM) run