We investigate the power system implications of the anticipated expansion in electricity
demand by datacentres. We perform a joint optimisation of Generation and Transmission Expansion
Planning considering uncertainty in future datacentre growth under various climate policies.
Datacentre expansion imposes significant extra costs on the power system, even under the cheapest
policy option. A renewable energy target is more costly than a technology-neutral carbon reduction
policy, and the divergence in costs increases non-linearly in electricity demand. Moreover, a carbon
reduction policy is more robust to uncertainties in projected demand than a renewable policy. High
renewable targets crowd out other low-carbon options such as Carbon Capture and Sequestration.
The results suggest that energy policy should be reviewed to focus on technology-neutral carbon