Source control SUDS strategic directions

Abstract

Background to researchThe uptake or transition from traditional drainage to sustainable drainage (SUDS) in Scotland has happened in a relatively short timescale (less than fifteen years) with site and regional control drainage structures such as ponds and basins now considered ‘business as usual’. This rapid transition to SUDS has been facilitated by a stakeholder platform called the Sustainable Urban Drainage Scottish Working Party (SUDSWP) which has promoted their use since 1997. This has subsequently led to Scotland being regarded as a frontrunner in SUDS implementation in the UK. However the uptake of source control as part of a stormwater treatment train is less routine than expected. With the aforementioned in mind, this Phase Three Report seeks to answer the question ‘How can the national uptake of source control be encouraged and influenced by the SUDS Working Party and whether they should recast their remit’? Objectives of research Phase One of this research looked at the background to the evolution of source control in Scotland providing preliminary insight into the enabling factors and obstacles for uptake of the systems since inception in the mid 1990’s. Phase Two appraised source control delivery on a global scale providing insight to enabling factors out with Scotland and appraising current delivery in Scotland by responsible organisations. The transition pathway from traditional drainage to source control SUDS was mapped out to highlight what the key enabling (and disabling) factors were to realise the transition to date. This phase of the research, Phase Three defines the next steps including comment on optimal source control and further considerations and recommendations. This involved analysis and consolidation of the findings from Phases one and two, a workshop delivered to SUDSWP and two surveys delivered online and via telephone interviews with professionals involved in source control SUDS. These findings are used to define barriers and opportunities to inform the development of a strategy to support and encourage implementation of source control within SUDSWP remit.Key findings and recommendationsKey findings and recommendations for the SUDS Working Party are grouped according to transition management cluster activities:* Transition Arena: Strengthen links with internal members and external stakeholders who have a stake in source control SUDS and develop an integrated long-term vision.* Transition Agenda: Develop a shared strategic plan which considers aligning agendas with other infrastructure initiatives and enforcement / inspection policies to ensure cost effective, fit for purpose measures particularly in the areas of unit plot, local streets and regeneration areas.* Transition Experiments / case studies: Encourage research partnerships to validate techniques in the source control toolkit not yet applied in Scotland and showcase case studies.* Transition Monitoring / evaluation: undertake a baseline assessment to gauge source control uptake and performance, revise existing guidance and encourage capacity building programmes.<br/

    Similar works