research

A preliminary design of a dump for 2.2 GeV, 4MW proton beam

Abstract

This note provides a first conceptual design of a dump to absorb the 4 MW proton beam emerging from the pion production target of a future CERN Neutrino Factory. This device has to be specially designed to cope with the enormous heating power density of the beam. The note deals with the design of the device from a thermal point of view only, without taking into account radiation issues

    Similar works